Back to Portfolio
Presidente Médici Power Plant — Phase C — Coal-Fired Thermal Plant
Thermal Power

Presidente Médici Power Plant — Phase C

Coal-fired thermal power plant

Scope and figures

The project

Electric power generation

Capacity

350 MW

Investment

BRL 3.8 bn (USD 750 M)

Type

Greenfield

Contract

EPC Supervision

Period

2006 – 2011

BRL figures restated to current values; USD figures at historical exchange rates.

Who was on the project

Owner

CGTEE (Eletrobras)

CGTEE
(Eletrobras)

NAUE Planejamento's client

EnerconsultEnerconsult ARCADIS LogosARCADIS Logos

Execution

CITICMain ContractorCITIC NWEPDIEngineeringNWEPDI

A challenge like yours?

Talk to NAUE and find the technical path for your project.

Talk to NAUE